To meet Sonnex’s growing energy needs at its Adelaide facility, Exceed Solar deployed a 200?kW rooftop system using AIKO’s ultra-efficient 465W ABC modules. With limited roof space and a high generation target, the system was designed to deliver maximum performance, long-term savings, and space-optimised installation—all without increasing panel count.
Project results
Energy Density
+16.44 W/m2 Energy Density
Annual Power Generation
+16,915 kWh/year Annual Power Generation
Annual Energy Income
+A$2,703 /year (Total Saving: $48,470/year) Annual Energy Income
Annual CO? Reduction
+14.2 tonnes CO?/year Annual CO? Reduction
(Results based on comparison with TOPCon modules on the same rooftop area)
Client Testimonial Client
Testimonial
Sonnex had high energy demands but limited roof space and an underpowered grid connection. We needed a panel with maximum efficiency and output in a compact size — AIKO’s Neostar 2P 465W was the obvious choice. It offered the highest power in the smallest footprint at the time, allowing us to maximise the system size and performance.